Overview

About Dubbo (Toongi)

The Dubbo rare earths project is an undeveloped deposit near Toongi in New South Wales, Australia, owned by Australian Strategic Materials (ASM). Energy Fuels, which has owned ASM since August 2026, calls Dubbo a globally significant resource of neodymium, praseodymium, dysprosium and terbium, plus zirconium, niobium and hafnium (Energy Fuels 8-K, October 2026). As of October 2026 the project had no final investment decision (FID) and was still in pre-feasibility work (8-K).

Where the Dubbo project is

The project sits near the town of Toongi, 25 kilometers south of Dubbo in central-western New South Wales and about 400 kilometers northwest of Sydney (ASM website). Mining Lease 1724 was granted in December 2015 and expires in December 2036. An ASM subsidiary, Toongi Pastoral Company, owns 3,456 hectares of land where the lease is located (8-K).

Who owns the Dubbo project (as of October 2026)

Energy Fuels' takeover of ASM was implemented on August 28, 2026, making ASM a wholly owned subsidiary (ASM FY2026 financial report). ASX removed ASM from its official list on August 31, 2026 (ASX notice).

What kind of deposit Toongi is

A 2016 study in Contributions to Mineralogy and Petrology describes Toongi as a small trachyte laccolith, about 0.3 square kilometers, that hosts significant resources of zirconium, hafnium, niobium, tantalum, yttrium and rare earths. The main ore minerals include complex silicates of sodium, iron, zirconium, niobium, yttrium and rare earths, dominated by a eudialyte-group mineral. The deposit belongs to a regional field of Late Triassic to Jurassic alkaline igneous rocks (Spandler and Morris, 2016).

REEx lists Dubbo with zirconium and heavy rare earth deposits in alkaline rocks.

The Dubbo rare earths project's heap leach plan (as of October 2026)

ASM changed its approach to Dubbo with a Heap Leach Scoping Study released in July 2025, part of an options assessment meant to find lower capital, shorter routes to rare earth production (FY2026 report).

In its last quarterly report, on July 30, 2026, ASM said the heap leach pre-feasibility study (PFS) was weighing two routes: separated rare earth oxides, or an intermediate mixed rare earth hydroxide precipitate (MREP). The MREP route could cut up to about A$200 million from the scoping study's A$740 million capital cost estimate, though ASM said those estimates remain preliminary and subject to change.

ASM was targeting completion of the PFS in the second half of 2026 (ASM June 2026 quarterly). Energy Fuels' October 2026 filing said it is preparing a pre-feasibility study under U.S. and Canadian reporting standards and gave no completion date (8-K).

On October 13, 2026, Energy Fuels said it expects to advance pre-feasibility work and evaluate a mixed intermediate product at Dubbo. That product would be separated into NdPr, dysprosium and terbium oxides at Energy Fuels' White Mesa Mill in Utah (8-K; ASM quarterly). If that route proves not feasible, Energy Fuels intends to keep evaluating other ways to bring Dubbo into production (8-K).

Funding and FID (as of October 2026)

Energy Fuels describes Dubbo as a development-stage project with no certainty that it can produce feed that the Mill can process. The filing's forward-looking statements give no assurance that a positive FID will be made (8-K). In October 2024, ASM was targeting an FID in the first half of 2026 (REEx, October 2024), a window that has since passed.

ASM's May 2026 scheme booklet listed conditional financing support from export credit agencies, including up to US$600 million from the Export-Import Bank of the United States, plus Export Development Canada and Export Finance Australia. The booklet calls these letters of interest non-binding, and they date from 2021 to 2024, before the heap leach redesign (scheme booklet). In July 2026, the scheme's independent expert said formal funding arrangements had not been secured (supplementary scheme booklet).

A A$5 million federal grant awarded in October 2024 under the International Partnerships in Critical Minerals program, matched by ASM, supported the options work (REEx coverage). ASM said the work covered by the grant was completed during the June 2026 quarter (June 2026 quarterly).

How Dubbo connects to the Korean Metals Plant

ASM's May 2026 scheme booklet described refining Dubbo ore on site into metal oxides and mixed chlorides for the company's metals plants (scheme booklet, May 2026). Energy Fuels' October 2026 filing sets out a downstream plan, pending successful development and if the mixed intermediate route proves feasible. Oxides separated from Dubbo material at White Mesa are expected to be made into metals and alloys at the Korean Metals Plant, and potentially a planned American Metals Plant. Once Dubbo is operating, Energy Fuels plans to evaluate producing oxides and mixed chlorides (8-K).

In August 2026, Energy Fuels said the Korean plant in Ochang had 1,300 metric tons a year of existing NdFeB alloy capacity. The company said an expansion to 3,600 metric tons a year was expected to be commissioned as early as the end of 2026 (Energy Fuels, August 2026).

Why Dubbo matters for heavy rare earth supply

Energy Fuels says Dubbo's resource estimates, particularly for NdPr, dysprosium and terbium, complement the company's existing feedstock strategy (8-K). In July 2026, REEx noted that the MREP route's possible capital savings depended on validation in the ongoing pre-feasibility study, and that those estimates remained preliminary (REEx, July 2026).

Dubbo rare earths project FAQ

Who owns the Dubbo rare earths project?

Australian Strategic Materials (ASM) owns the project. ASM has been a wholly owned subsidiary of Energy Fuels since August 28, 2026, and was removed from the ASX official list on August 31, 2026.

Where is the Dubbo project?

The Dubbo project is near the town of Toongi, 25 kilometers south of Dubbo in central-western New South Wales, Australia, and about 400 kilometers northwest of Sydney.

What metals does the Toongi deposit contain?

Energy Fuels calls Dubbo a resource of neodymium, praseodymium, dysprosium and terbium, plus zirconium, niobium and hafnium. A 2016 study adds tantalum and yttrium. The study found that the main ore minerals in the trachyte body include rare earth-bearing silicates dominated by a eudialyte-group mineral.

Has a final investment decision been made on Dubbo?

No. As of October 2026 Energy Fuels described Dubbo as a development-stage project and gave no assurance of a positive FID. In July 2026, ASM was targeting completion of a heap leach pre-feasibility study in the second half of 2026. Energy Fuels' October 2026 filing said a pre-feasibility study was being prepared and gave no completion date.

How is the Dubbo project being financed?

ASM's May 2026 scheme booklet listed conditional, non-binding letters of interest from export credit agencies, including up to US$600 million from the Export-Import Bank of the United States. No formal funding had been secured. A A$5 million federal grant awarded in October 2024, matched by ASM, supported ASM's options study.

How is Dubbo linked to the Korean Metals Plant?

Energy Fuels expects to evaluate whether Dubbo can first produce a mixed rare earth intermediate for separation at its White Mesa Mill in Utah. If it can, the oxides are expected to be made into metals and alloys at the Korean Metals Plant in Ochang and potentially a planned U.S. plant. Energy Fuels has not yet said whether that route is feasible.

Related

Project Data

Resource estimates, grades and rankings for Dubbo (Toongi) are in REEx Insights, along with data on every project REEx tracks.

Explore REEx Insights →

REEx Intelligence

Latest News

Straight Into Your Inbox

Straight Into Your Inbox

Receive a Daily News Update Intended to Help You Keep Pace With the Rapidly Evolving REE Market.

Fantastic! Thanks for subscribing, you won't regret it.