Project Profile

Longonjo

Operator

Pensana

Country

Angola

Ore type

Carbonatite, Monazite, Bastnäsite

Key Facts

Operator
Pensana
Country
Angola
Ore type
Carbonatite, Monazite, Bastnäsite
Status
Construction
Target year
2028
Location
-12.923, 15.2183
Target elements
Overview

About Longonjo

The Longonjo rare earth project is a carbonatite deposit in central Angola that Pensana is building into a mine and plant to produce a mixed rare earth carbonate (MREC). As of September 2026 construction was over 30% complete, and Pensana said the schedule is expected to run to late 2028 while it finalizes financing. Its named offtake partners hold only memorandums of understanding (June 2026).

Where the Longonjo rare earth project is

Longonjo sits beside the Lobito rail corridor, about 60 kilometers west of Huambo, the provincial capital, according to Pensana's September 25, 2026 update. Free-dig ore is to be concentrated, calcined and chemically refined on site, and the MREC railed 273 kilometers to the Atlantic port of Lobito for export (Pensana, September 2026).

Who owns Longonjo (as of October 2026)

The project is 100% owned by Ozango Minerais S.A., a majority-owned Pensana subsidiary (March 2026 interim results). Angola's sovereign wealth fund, FSDEA, paid the final tranche of a US$25 million equity investment into Ozango in early 2026 (Pensana, February 4, 2026). That cut Pensana's stake in Ozango from 84% to 68.4%, according to its March 2026 interim results. The company said it expected ownership to change again and its own share to rise.

Under a proposed US$165 million investment, Cascade Natural Resources would put US$15 million into Pensana for 3.8% of the company and US$150 million into Sable Min, the Pensana subsidiary that holds the majority of Ozango, for 38.2% of Sable (Pensana, April 17, 2026). Cascade paid the US$15 million in April, and the US$150 million was still outstanding on August 6 (Pensana, August 6, 2026).

The deposit: weathered carbonatite with monazite

Longonjo is a Cretaceous carbonatite diatreme about 2.5 kilometers across (Pensana 2025 annual report). Its ore is a weathered layer 20 to 30 meters thick containing monazite and bastnaesite (project page). The current mine plan is based on the top 30 meters of the orebody (September 2026).

Pensana plans 20,000 metric tons a year of MREC at first, expanding to 40,000 metric tons once operations are established (September 2026). A heavy rare earth recovery circuit is being designed with a target of more than 122 metric tons a year of dysprosium and terbium (Pensana, August 10, 2026).

Longonjo construction and timeline (as of October 2026)

Main construction began in July 2025 (interim results). In June 2026 Pensana still targeted first MREC commissioning in 2027. On August 10 it moved first production to 2028.

On September 25, 2026, Pensana said construction was over 30% complete. It also said outstanding detailed design, high-cost site work and long-term procurement items had been ramped down until financing is finalized. As a result, the construction schedule is expected to extend from 2028 to late 2028 (September 25, 2026). REEx examined that funding gap in September 2026.

Funding and offtakes (as of October 2026)

In September 2026 Pensana said talks with Cascade continue and it had opened detailed financing talks with major shareholders (September 25, 2026). Debt is planned through a proposed US$160 million package arranged by Absa and guaranteed by the Export-Import Bank of the United States (June 2026). EXIM's role so far rests on a letter of interest to participate in up to 100% of that debt, announced in October 2025 (Pensana, October 28, 2025). REEx noted at the time that full EXIM board approval was still pending.

The named offtake partners, per Pensana's June 2026 update:

  • Toyota Tsusho: non-binding MOU (June 2025) for up to 20,000 metric tons a year of MREC over five years.
  • ReElement Technologies: non-binding MOU (June 2025) for a five-year MREC offtake, for possible processing in Marion, Indiana.
  • Vacuumschmelze (VAC): MOU (October 2025) for MREC intended to feed the eVAC Magnetics magnet plant in Sumter, South Carolina.

In June 2026 Pensana said pricing across these MOUs remained subject to final agreement (June 8, 2026). In September 2026 it said it intends to sign offtake agreements, when required, to support the Absa and EXIM debt (September 25, 2026).

What happened to the Saltend refinery plan

In October 2025 Pensana dropped its plan for a separation refinery at Saltend, near Hull in the UK, and reoriented its downstream work toward the U.S., Argus Media reported, quoting Pensana's Paul Atherley: "we are reorienting to the US because that's where the money is" (Argus, October 17, 2025).

In June 2026 the company said it was optimizing the Saltend design as modular trains, to be built in "the most operationally and commercially advantageous location" (June 8, 2026).

Why Longonjo matters for supply

Pensana plans for Longonjo's MREC to contain the light magnet metals neodymium and praseodymium plus the heavy magnet metals dysprosium and terbium (Pensana, March 2026). Whether it reaches production depends on two items still open at Pensana's September 2026 update: closing the debt and the rest of the Cascade money, and turning MOUs into binding offtakes (Pensana, September 25, 2026). REEx reviewed those risks in June 2026.

Frequently asked questions

Where is the Longonjo rare earth project?

Longonjo is in Huambo province in central Angola, about 60 kilometers west of the city of Huambo and beside the Lobito rail corridor. Its product is to be railed 273 kilometers to the Atlantic port of Lobito.

Who owns the Longonjo project?

Ozango Minerais S.A., a majority-owned subsidiary of Pensana, owns 100% of the project. Pensana's stake in Ozango fell from 84% to 68.4% after a US$25 million investment by Angola's sovereign wealth fund, FSDEA, according to its March 2026 interim results, and the company expects ownership to change again.

When will Longonjo start production?

On September 25, 2026, Pensana said construction was over 30% complete and that the construction schedule is expected to extend from 2028 to late 2028 while financing is finalized. Earlier in 2026 the company had targeted 2027.

What will Longonjo produce?

A mixed rare earth carbonate made on site from weathered carbonatite ore containing monazite and bastnaesite. Pensana plans 20,000 metric tons a year at first, expanding to 40,000, and is designing a heavy rare earth circuit targeting more than 122 metric tons a year of dysprosium and terbium.

Does Longonjo have binding offtake agreements?

Not as of Pensana's September 2026 update. Toyota Tsusho and ReElement Technologies have non-binding MOUs and VAC has an MOU, with pricing still to be agreed. Pensana says it intends to sign offtake agreements when required to support its Absa and EXIM debt.

What happened to Pensana's Saltend refinery in the UK?

In October 2025 Pensana dropped its plan for a refinery at Saltend, near Hull, and reoriented toward the U.S., Argus reported. In June 2026 Pensana said it was optimizing the Saltend design for deployment in "the most operationally and commercially advantageous location."

Related

Project Data

Resource estimates, grades and rankings for Longonjo are in REEx Insights, along with data on every project REEx tracks.

Explore REEx Insights →

REEx Intelligence

Latest News

Straight Into Your Inbox

Straight Into Your Inbox

Receive a Daily News Update Intended to Help You Keep Pace With the Rapidly Evolving REE Market.

Fantastic! Thanks for subscribing, you won't regret it.