About Halleck Creek (Laramie)

Halleck Creek is a rare earth project in southeastern Wyoming's Laramie Range, owned by American Rare Earths (ARR). The company calls it the largest known rare earth deposit in the United States by contained rare earth oxide, a company claim. As of September 2026 its latest published study was a scoping study, with a pre-feasibility study in progress and no mine permit application filed.

Where Halleck Creek is

Despite the name, the project is not at the city of Laramie. It lies in the Laramie Range in Albany and Platte Counties, about 43 miles (70 km) northeast of Laramie and near the town of Wheatland, according to ARR's September 2026 technical report.

Who owns the project (as of September 2026)

Halleck Creek is held by Wyoming Rare (USA) Inc., a wholly owned subsidiary of ARR. The land combines Wyoming state mineral leases with federal lode claims. ARR bought the leases and its first federal claims from Zenith Minerals in 2021 and has since staked more (ARR).

What kind of deposit Halleck Creek is

The deposit lies in the Red Mountain Pluton, part of the roughly 1.4-billion-year-old Laramie Anorthosite Complex. Its rare earths are carried mainly in the mineral allanite, with zircon as a secondary host (ARR). A 2025 Geological Society of America abstract led by a University of Wyoming researcher who is also affiliated with Wyoming Rare (USA) Inc., likewise found allanite to be the main host across the pluton and called Halleck Creek an unconventional new rare earth resource.

The mineralization is spread through the rock rather than held in veins. It sits at or near surface with a low strip ratio, and ARR assumes conventional open-pit mining. For scale, Halleck Creek carries a company-reported JORC resource of about 2.63 billion metric tons, REEx reported in August 2026.

The Cowboy State Mine and permitting (as of September 2026)

The first phase, the Cowboy State Mine, sits on state mineral leases, which makes the Wyoming Department of Environmental Quality the main permitting agency. ARR says a Wyoming permit to mine typically takes two to three years, against more than 10 for federal permits (company page). ARR plans to develop the federal ground in a later phase.

ARR is preparing a permit-to-mine application with WWC Engineering. As of September 30, 2026, no application had been filed and no mining approvals had been granted. Water rights were not yet secured. In July 2025, ARR reported extracting more than 3,000 tons of ore in test mining (REEx).

Study results and timeline

ARR's updated scoping study of September 30, 2026, models a 4.5-million-metric-ton-per-year operation over 26 years, averaging about 2,500 metric tons of NdPr oxide a year (neodymium and praseodymium). It also lists SEG (samarium-europium-gadolinium), terbium and dysprosium oxides as products. Ore would be concentrated at the mine and refined at a proposed plant near Wheatland or Laramie. The study schedules commissioning in 2030 and commercial production in 2031. It is not a pre-feasibility or feasibility study, and no ore reserves have been declared.

Heavy rare earth recovery assumptions fell sharply from the 2025 study. Expected dysprosium recovery dropped from 66.5% to 12.4%, and terbium from 70.2% to 28.7% (ARR), a drop REEx flagged as a key risk. Test work aimed at better recoveries is scheduled to move to the Saskatchewan Research Council in December 2026. ARR has made mixed oxide only, REEx reported, and it targets separated oxide from its pilot and demonstration program for late in the second quarter of 2027.

Funding (as of September 2026)

The Wyoming Energy Authority approved a $7.1 million matching grant in June 2024 (Cowboy State Daily). In September 2024, the Export-Import Bank of the United States sent a non-binding letter of interest for up to $456 million in debt (ARR). The letter's amount matched the capital estimate in ARR's March 2024 study. The 2026 study puts initial capital at about $900 million, and the letter was still not committed financing as of September 2026.

REEx's reporting points to capital as the main hurdle. ARR director Melissa Sanderson named attracting capital as the project's biggest remaining challenge (REEx). REEx also reported a going-concern note from the company's auditor.

Why Halleck Creek matters for U.S. supply

If built, Halleck Creek would add a domestic source of NdPr oxide, along with terbium, dysprosium and SEG oxides, to United States supply, under a state permit for its first phase. Before that, ARR still has to file for and win a mine permit. It also has to lift heavy rare earth recoveries from allanite ore and raise financing it does not yet have.

Frequently asked questions

Where is the Halleck Creek rare earth project?

It is in the Laramie Range in Albany and Platte Counties, Wyoming, about 43 miles (70 km) northeast of the city of Laramie and near Wheatland.

Who owns Halleck Creek?

Wyoming Rare (USA) Inc., a wholly owned subsidiary of American Rare Earths, holds the project. ARR acquired the state leases and first federal claims from Zenith Minerals in 2021.

What type of rare earth deposit is Halleck Creek?

It is a magmatic deposit in the Red Mountain Pluton, part of the Laramie Anorthosite Complex. The rare earths are held mainly in allanite, with zircon as a secondary host, and ARR assumes the near-surface body can be mined by open pit.

Is Halleck Creek the largest rare earth deposit in the U.S.?

American Rare Earths describes it as the largest known U.S. rare earth deposit by contained rare earth oxide. That is a company claim. Its company-reported JORC resource is about 2.63 billion metric tons.

When will Halleck Creek start production?

ARR's September 2026 scoping study schedules commissioning in 2030 and commercial production in 2031. The study declares no ore reserves, and no mine permit application had been filed as of September 30, 2026.

Related

Project Data

Resource estimates, grades and rankings for Halleck Creek (Laramie) are in REEx Insights, along with data on every project REEx tracks.

Explore REEx Insights →

REEx Intelligence

Latest News

Straight Into Your Inbox

Straight Into Your Inbox

Receive a Daily News Update Intended to Help You Keep Pace With the Rapidly Evolving REE Market.

Fantastic! Thanks for subscribing, you won't regret it.